Residential Building Permits:
Pool and Spa Inspections:
  • A site inspection is required for the location of the pool or spa.

  • A Bonding inspection is required for the proper grounding of the armature or equipment.

  • Electrical inspections (Rough-in and Final) as required

  • Final Inspection (may be combined with Final Electrical if applicable)

  • Contact the Mobile County Board of Health for plumbing requirements and permits. (251) 634-9802

 

 

 

Inspection Office

MOBILE COUNTY
INSPECTION OFFICE

1110 Schillinger Road N, Ste 100
Mobile, AL 36608
(251) 574-3507

CLICK HERE
TO GO BACK

Do I need a Residential Permit? | Where do I get a Residential Permit? | Street address and Flood Zone verification | Requirements for Residential Building Permits | Requirements for building in a Flood Zone | After obtaining your building permit you may need: | Inspection Sequence | Notes on Inspections | Pool and Spa Inspections | Other Inspections | Manufactured Homes and Modular Buildings | Permit requirements for manufactured homes | Permit requirements for Modular Homes and Buildings | Enforcement of Building Codes | One last thing on permitting | Additional items that may arise during your building experience | Sewage Disposal Systems - sewer hook-up and Septic Tank Systems | Local Flooding | Environmental Concerns | Document Downloads | Permit Home Page

RETURN TO BUILDING PERMITS PAGE



HOME| MISSION| LOCATIONS| ORGANIZATION| BUDGET| FAQS| MAPS
LIBRARY | CONTACT US | LINKS | CALENDAR| BULLETINS
PAY-AS-YOU-GO | ROAD INVENTORY | TRAFFIC COUNT
BUILDING PERMITS | CONSTRUCTION PHOTOS

Web page design and hosting by Site One on the Internet. Copyright©2009